top of page
SHOW_HOME_EXTERIOR_254.jpg
WSCA Logo - Rev B.png

Community & Leisure

We have a wealth of experience covering educational buildings, public and sports and leisure. Whether it is just an extension, or a new build facility, our team is here to guide you through the process from drawing board to completion. 

Saunton Sands Spa

Woodward Smith were commissioned to extend the iconic Saunton Sands hotel to provide a new dedicated Spa facility. Spanning three levels the Spa provided dedicated wellness spaces to relax and receive treatments, all with stunning views over the beach and beyond. This is a must for anyone visiting North Devon!

Client  |  The Brend Group

Contractor  |  Pearce Construction

Appointment  |  RIBA stages 0-6

Willingcott Valley

Willingcott Valley is a development of 107 holiday homes in Woolacombe. The client's aspiration was to provide coastal holiday homes with a contemporary twist, with high quality accommodation and sustainable credentials. The scheme utilises natural materials to ensure that the homes sympathetically blend into the natural undulating landscape. 

Client  |  Willingcott Valley

Contractor  |  nHouse / Elite / Lodgico

Appointment  |  RIBA stages 0-5

Poldhu

This project consisted of the demolition of an existing bungalow for a replacement two storey modern dwelling near Padstow. The design features an angular form with panoramic first floor views over the Atlantic Ocean. The property is now being used as a holiday let, you can find further details here

Photos © Perfect Stays Ltd.

Client  |  Private

Contractor  |  Arrowbuild

Appointment  |  RIBA stages 0-6

Taw Garages

The former Plumb Centre warehouse was the new home of Taw Garages for the Brend Group and in 2006 the practice was commissioned to renovate this building to relocate the business from Taw Vale. The building took on a complete transformation with a new dedicated showroom and office space together with a service and MOT facility.

Client  |  The Brend Group

Contractor  |  Pearce Construction

Appointment  |  RIBA stages 0-6